Trusted by Elevator & Lift Companies in 20+ Countries
Powering elevator businesses worldwide
Track lift installation projects floor by floor, site by site - from contract award to handover. Built for contractors running forty towers at once in Dubai, Riyadh and Doha.
Powering elevator businesses worldwide
Dozens of lifts across multiple towers, each on its own milestone schedule and approval clock. Impossible to track on a spreadsheet.
Approval documentation assembled manually, chased across endless email chains - delaying handover and ultimately delaying payment.
Distributed site teams and subcontracted installers with no real-time head-office view of milestone completion progress.
Job Import brings every project in; PMS Master and PMS Checklist track it stage by stage.
Each installation milestone is closed against a defined checklist, not a status guess.
Warehouse/Inventory Master plus PO and Delivery Challan formats give a full paper trail on what's arrived on site.
The Handover Checklist and Handover Format standardise what 'done' looks like - every time.
A completed Handover Format feeds directly into an AMC Quotation/Contract Format - no re-keying data.
The commercial side of both the installation project and the maintenance relationship that follows it.
Compliance information reviewed by Sumeet Katariya, Founder, ElevatorPlus
Reviewing your current site plans and compliance guidelines.
Mapping towers, shafts, milestones, and uploading historical logs.
Training back-office dispatchers and field crews on the mobile app.
Going live, compiling DM inspection logs, and preparing maintenance pipelines.
All modules, no per-user fees, no per-seat scaling. One flat price - contracts, PM, breakdown, inventory, installation, reporting.
See full pricing detailsElevator project management software tracks new lift installation from contract award through to handover, covering site progress, material delivery, subcontractor crews, inspection sign-offs and payment milestones across multiple towers at once. It differs from maintenance software because the work is a finite project with a completion date, not a recurring service contract.
Yes. Each tower is a project with its own units, milestones, crews and progress against schedule, and every active project appears on one dashboard. Material delivery and installation stage are tracked per shaft, so a delay in one tower does not disappear inside a portfolio-level view.
Yes. Third-party inspection by an EIAC-accredited body once every 12 months is scheduled and recorded against each unit, with the report stored on the unit record. Because Dubai permits either ASME A17 or BS EN 81 on a project but never both, the applicable suite is set per project.
Yes. Under the SASO Technical Regulation, no service lift may be used until it is registered with the competent authority, and that registration is renewed annually once periodic inspection results are assessed. ElevatorPlus tracks that renewal date per unit and flags it ahead of expiry. The dated certificate required outside the car on the ground floor is stored on the same record.
Yes. Projects, contracts and invoices each run in their own currency, so a UAE project in AED and a Saudi project in SAR sit in the same account without conversion errors. Reporting rolls up to a single reference currency of your choosing.
At handover, the project's units, drawings, warranty dates and commissioning records carry across into a maintenance contract rather than being re-entered. That continuity matters because the warranty period and the first statutory inspection both start at handover, and both need the project history sitting behind them.
Yes. Subcontracted crews get app access scoped to their own scope of work, so they log progress, upload photos and record completed stages without seeing commercial data or other projects. You keep one live view of site progress instead of chasing WhatsApp updates.
Join elevator companies in 20+ countries already growing with ElevatorPlus.
Book a Strategy Call Now